UWE Level 2 Nuclear Labs, Bristol
2 April 2025

RPC are decommissioning the last of the nuclear labs at University of the West of England to allow for new teaching space.
We are working alongside UWE design team and the end client UWE. We have started the process with specialists, Aurora who have produced an independent radiological survey. A CCTV drainage survey has also been conducted.
As we are in the design process, to help keep the project running on time RPC have coordinated the decommissioning to allow for the room to be stripped in preparation for the works. The decommissioning is the Electrical, Radiological, Gas and Water.
We are excited to give an update once this is complete.